The "GARAGE" is moving right along ...... I'd like to say smoothly but with Tom trying to be the pit boss he is making it go more like bumpy.
He ordered the rafters to be delivered BEFORE the dirt work was done and the slab poured.... SO the BIG TRUCKS had to maneuver in a small area to get turned around........ He was probably just testing their abilities to do so.
He ordered the rafters to be delivered BEFORE the dirt work was done and the slab poured.... SO the BIG TRUCKS had to maneuver in a small area to get turned around........ He was probably just testing their abilities to do so.
He did plant himself ON the rafters so it gave them a little more reason to not back over them or come to think of it ........ more challenging to NOT run over them.... J/K
The slab was poured and is looking good.
Tom ordered ALL the stuff for the garage to be delivered except the insulation and sheet rock...... Sure hope the rain doesn't cause too much damage before we start to build..... The slab was poured and is looking good.
It's probably a good thing that his back slows him down and his hand is out of commission for awhile...... I'm thinking nobody would be safe with a nail gun in his hands......